Fabrication Fire Fighting Line.
Maintenance of Boilers (Stabilizer Boiler E).
Maintenance of Heat Exchanger.
Maintenance of Heater.

Fabrication of Stainless Steel Tanks.
Installation of Stainless Steel pipe lines.

Fabrication of Stainless Steel Tanks.
Maintenance of boilers and flame tubes.

Installation of Stainless Steel pipe

Construction of lOth of Ramadan Plant including piping network and Tanks for oil refinery

Maintenance of boilers (Denmark) Maintenance of boilers Water Tube 25 ton capacity (Tacoma Japanese).

Construction of 5 Storage tanks 1400 Ton Capacity each.

Installation of Stainless Steel pipe

Electro-mechanical installation for eggs processing plant

Fabrication of Chemical Storage tanks
Installation of Steam System

Main Contractor for Oil Refining plant

Fabricate Sand Filters

Condensers maintenance
Fabricate Fire Fighting Tanks
Fabricate condenser coils
Modification works in the fire fighting water line2023
Fabrication S tanks 2024

Installation of Boiler and Sub-equipment
Supply & installation of Chimney & Ducts
Supply & Installation of Feed water tank & Platform

- Pipe Lines Network
(Water Piping Network - Steam Piping Network - Starch Piping Network - Compressed Air Network – fabrication & install Pipe rack of Steel Beam Section)

Fabrication storage Tanks
Installation for Piping for Refinery plant

Fabricate Fire Fighting Tanks
Supply & Install Pipe lines

Line 3 inve
Upgrade production lines ( 3 & 4 )
Replacement line
Ovens Insulation

Substation Earthling System
Factory Electrical Assessment
Fabrication s & c.s Tanks
Fabrication steam Header

Supply & Install Pipe lines
Dust Collector
Install and weld S.S cable trays
Supply & Install S.S plat form
Fabricate and Install of Eccentric reduce
Modify of Machine Supporting structure